Why Certification Matters
Industrial equipment must comply with defined codes, standards, and contractual requirements before it can be installed, operated, or exported.
Certification failures lead to:
- Shipment rejection
- Regulatory rejection
- Installation delays
- Contractual disputes
Certification is not just a documentation exercise. It is structured technical verification. HIT Global supports manufacturers, EPCs, and operators in validating compliance prior to release.
Scope of Services
Welding Qualification Verification
Verification of welding procedures and welder qualifications in accordance with:
- ASME Section IX
- EN 15614
- AWS D1.1
Scope includes review and witnessing of:
- WPS (Welding Procedure Specification)
- PQR (Procedure Qualification Record)
- WPQ (Welder Performance Qualification)
Design & Manufacturing Code Alignment
Verification of equipment compliance with:
- ASME
- API
- EN 13445
- EN 1090
- Client-specific specifications
We review documentation, calculations, and traceability records to confirm alignment before final acceptance.
Material Certification
Verification of material compliance, including:
- EN 10204 3.2 certification
- Heat number traceability
- Mill Test Certificate validation
Traceability gaps are identified before shipment.
Fire Safe Testing
Certification support aligned with:
- API 607
- API 6FA
Witnessing and documentation validation for fire-safe performance of valves and related equipment.
Fugitive Emissions Testing
Verification aligned with ISO 15848 and equivalent standards, including:
- Test witnessing
- Procedure validation
- Documentation review
We coordinate with testing bodies and manufacturers to ensure documentation readiness.
How We Operate
Certification support follows a structured workflow:
- Standard and code identification
- Documentation review
- Procedure verification
- Witnessing of tests (where required)
- Gap identification
- Final compliance confirmation
All findings are documented formally. No assumptions.
No informal acceptance.
DELIVERABLES
- Certification Review Reports
- Compliance Review Reports
- Witness Reports
- Documentation Gap Analysis
- Traceability Confirmation
- Final Validation Summary
Each deliverable references the applicable code or standard clause.
When To Engage Certification Support
- Pressure equipment fabrication
- High-value rotating equipment
- International export projects
- Projects with strict regulatory oversight
- Client-mandated third-party validation
Early certification alignment reduces rework and prevents shipment holds.
Integration with Other Services
Certification services can be:
- Integrated with Third-Party Inspection
- Combined with NDT verification
- Coordinated with Expediting
- Delivered as standalone technical validation
The structure depends on project complexity and contractual obligations.